Our teams consist of people from all over the world who work hand in hand with one another.
To ensure that the village of Kalpetran and the tracks of the Matterhorn-Gotthard Railway continue to be protected from rockfall in the future, the Volken Group is implementing various elements by autumn 2024. The existing construction road will be extended to a width of 3.5 m so that the earth embankment can be raised and optimized over a length of around 200 m - with an earth-reinforced support structure and a block camber. In this danger zone, work can only be carried out in good weather; in addition, access over the MGB tracks is only possible with a 3-axle truck.