Our teams consist of people from all over the world who work hand in hand with one another.
Wherever football is played, the public also needs space. This is the only way to ensure safety on and off the field. For this reason, the Volken Group has removed three meters from the multi-use sports field, structurally adapted it with a green slope (TerraMur) around 85 meters long and up to 10 meters high, and extended the ramps on the valley side by 10 meters. A sporting task that also involved the use of a 3D machine-controlled 30 t hydraulic excavator, a small excavator, a dumper and a roller.