We have well-established safety measures in place to protect our employees and the environment.
Wherever football is played, the audience also needs space. This is the only way to ensure safety on and off the pitch. That is why the Volken Group removed three meters of the multi-purpose sports field, adapted it structurally with a grassed embankment (TerraMur) around 85 m long and up to 10 m high, and extended the valley-side ramps by 10 meters. A sporting task that also involved the use of a 3D machine-controlled 30 t hydraulic excavator, a small excavator, a dumper and a roller.