Raron

The new A9 exit has right of way: Basperstrasse Raron pipeline construction.

In future, people coming from Visp will be able to leave the A9 at Raron - directly via the Raron covered cut (GERA). Even before this road is built, the Volken Group is constructing various service and water pipes to make it accessible. This requires the removal of around 2500 m3 of soil, the excavation of 4000 m3 and the construction of nine inspection shafts and nine cable shafts. This is followed by around 4500 m of pump and pressure pipes, 12000 m of cable protection pipes and 1000 m3 of sand coating. Our civil engineering specialists are using two large crawler excavators and a large dumper for this. To ensure that the employees of Bregy Haustechik AG, Schneider-Bregy und Partner AG and Voweg AG can get to work undisturbed and safely, the runway at Raron airfield will be temporarily closed to air traffic.
Are you also planning preparatory work for a development? Our civil engineering team will be happy to do the groundwork and pave the way for something new.

Benefits with the Volken Group

Open to different cultures

Our teams consist of people from all over the world who work hand in hand with one another.

Safety first

We have well-established safety measures in place to protect our employees and the environment.

Effective networks

We maintain strong relationships with partners, suppliers and customers.