Glis

Baumeister MFH Stadtgrün

  • Client: H3 Immobilien AG, 3900 Brigerbad
  • Construction Manager / Reference Person: machart architektur gmbh / Marc Chanton
  • Construction Foreman: Pierluigi D`Onofrio 
  • Foreman: Gabriel Wyssen
  • Construction time: May 2022 - October 2023
  • Construction costs: 3.5 Mio

Technical specifications:

  • 7'000 m² wall formwork type 2
  • 6,000 m² slab formwork type 2
  • 360 to reinforcement
  • 3'800 m³ concrete
  • 1500 m² concrete surface winging off
  • 1900 m² brickwork brick
  • Seal 600 m construction joint

Object description:

The building includes 15 spacious residential units, 2 commercial spaces and a parking garage with 27 parking spaces.

Special requirements:

  • Short construction time 
  • Mostly no 90-degree angles.