Demolition / new construction parking garage Betten

  • Client:  Bettmeralp Bahnen AG, 3992 Bettmeralp
  • Construction Manager / Reference Person: VWI Ingenieure AG, Naters/Zurwerra Philipp
  • Construction Foreman / Foreman: Zenklusen Nicolas / Steiner Erich
  • Construction time: Februar 2017 bis Dezember 2017
  • Construction costs:  CHF 8.97 Mio

 

Technical specifications:

  • 19'500 m2 mono concrete
  • 200 pcs prefabricated piers
  • 6'000 m3 concrete
  • 1'000 m2 shotcrete with anchors
  • 2'000 m3 concrete demolition
  • 17'000 m2 prefabricated slab elements
  • 10'000 m3 excavation

Object description:

 

The construction work was carried out by the consortium Walpen AG / Frutiger AG and Ruppen Peter AG.

  • Lead management: Walpen AG
  • Tech. Management: Walpen AG
  • Commercial management: Frutiger AG

The project New construction of parking garage Betten included the following works:

Civil engineering works:

  • Demolition of existing car park building (concrete, steel, sheet metal).
  • Excavation work incl. excavation support, demolition work surrounding area, backfilling, infrastructure lines, drainage as well as surrounding area work and asphalt work.


New construction of the parking garage:

  • Concrete work (formwork, reinforcement, concrete), precast concrete floors, precast columns, and flooring of the parking areas.
  • The new parking garage has a total of 658 parking spaces.

Special requirements:

  • Short construction period (start demolition old parking garage 13.03.2017 / opening new parking garage 16.12.2017)
  • Complex project