- Client: Volken GU AG, 3930 Visp
- Construction Manager / Reference Person: Architektur Kummer AG / Michel Kummer
- Construction Foreman: Pierluigi D`Onofrio
- Construction Foreman STV: Thomas Imhof
- Foreman: Michael Eggel
- Construction time: February 2023 - December 2023
- Construction costs: 700'000 CHF
Technical specifications:
- 1'100 m³ excavation
- 1'000 m² wall formwork type 2
- 200 m² wall formwork type 3.1
- 700 m² slab formwork type 2
- 40 to of reinforcement
- 400 m³ concrete
- 160 m² brick masonry
- 40 m² sand-lime brickwork
Object description:
A single-family house on four floors. The surrounding walls were built according to the formwork type 3.1 board structure.
Special requirements:
- Tight space conditions
- Many walls from the angle
- Exposed concrete type 3.1