Baltschieder

HWS Baltschiederbach bed load barrier

  • Client: Municipality of Baltschieder 
  • Construction Manager / Reference Person: Nicola Kalbermatten
  • Construction Foreman: Mathias Wyssen
  • Deputy foreman: Iwan Rieder
  • Foreman: Diego Cathrein
  • Construction time: May/2021 - Sept./2023
  • Construction costs: CHF 11'000'000.-

 

Technical specifications:

  • face concrete 9'000m3
  • Mass concrete 10'000m3
  • Reinforcement 1'300 tons
  • Excavation 40'000m3

 

Object description:

On the construction site HWS Baltschiederbach the existing dam will be raised to protect the inhabitants of Baltschieder from future storms. 

 

Special requirements:

  • Wall formwork with up to 30 degrees of tightening.
  • Special concrete types
  • High walls
  • Work near the river