Glis

Ischi Arena

  • Client: Municipality of Brig-Glis
  • Site management / Reference person: Ricci Architekten, Brig / Müller Isabell
  • Site manager / Foreman: Hutkai Peter / Wyssen Gabriel
  • Construction time: 6 months
  • Construction costs: CHF 2.8 million

Technical data:

  • 275 tons of reinforcement
  • 8.00m high concrete walls
  • 5.40m concrete ceiling (height)
  • 8'800m2 Wall formwork
  • 2'500m2 Slab formwork
  • 325m2 Brick masonry
  • 100m2 Cement block masonry
  • 3'000m3 concrete
  • 8'500m2 Exposed formwork type 2.1
  • 3'800m3 excavation

Project description:

The project includes a 30x60 m field hockey pitch for a variety of uses, a curling area with four lanes, changing rooms and technical rooms as well as a hall for martial arts in a location that is close to the city center and therefore easily accessible for pedestrians. The traffic concept provides for connections to public transport and an adapted parking area.

Requirements:

  • Short construction time
  • Coordination with subcontractors
  • Complex project