Bitsch

Kastanienhof residential development

  • Client: Volken Immobilien AG
  • Site management / Reference person: Kurt Werlen Albrecht Architekten
  • Foreman: D'Onofrio Pierluigi
  • Foreman: Carlos Dias
  • Construction period: September 2019 to July 2021
  • Construction costs: 3 million

Technical data:

  • 10'000m3 excavated material
  • 8'500m2 wall formwork
  • 7'500m2 slab formwork
  • 350 tons of reinforcement
  • 3'700m3 concrete
  • 5'500m2 Brickwork

Project description:

3 apartment buildings with 2.5, 3.5, 5.5 and two 5.5 attic room apartments. The apartment buildings are centrally located. Various shopping facilities, post office, sports field and the train station are just a few minutes' walk away.

Requirements:

  • Short construction time
  • Work in the area of traction current systems
  • Start of pandemic measures

Contact persons

Pierluigi D'Onofrio

Head of Pollutant Remediation Department /
Head of underlayment department /
Technician HF / Site Manager SBA

+41 27 948 05 14

pierluigi.donofrio@volken-group.ch