- Client: Passeri Roberto AG
- Site management / Reference person: Passeri Roberto
- Foreman: D'Onofrio Pierluigi
- Foreman: Pedro Oliveira
- Construction period: May 2019 to May 2020
- Construction costs: CHF 650,000
Technical data:
- 500m3 excavated material
- 1'600m2 wall formwork
- 2'000m2 slab formwork
- 65 tons of reinforcement
- 700m3 concrete
- 300m2 brickwork
Property description:
Apartment building with six 4.5 and one 5.5 attic room apartment. The apartment building is centrally located. Various shopping facilities, post office, sports field and the train station can be reached in a few minutes.
Requirements:
- Work in the area of traction current systems
- Small installation site