Visperterminen

Muttji surge chamber

  • Client: EnBAG AG
  • Site management / Reference person: Teysseire & Candolfi AG / Abgottspon Pascal
  • Foreman: D'Onofrio Pierluigi / Theler Beda
  • Foreman: Schnydrig Mario
  • Construction time: October 2016 to November 2018
  • Construction costs: CHF 1.0 million

Technical data:

  • 450 m3 concrete
  • 50 tons of reinforcement
  • 950 m3 Excavation
  • 8 micropiles
  • 1'350 m2 wall formwork
  • 200 m2 slab formwork


Project description:

Above Visperterminen, in Muttji, a surge chamber was newly constructed together with two distribution shafts for the delivery of the corresponding water. The construction work was carried out by the consortium Walpen AG (50%) and Schmid Bautech AG (50%).

  • Lead management: Walpen AG
  • Technical management: Schmid Bautech AG
  • Commercial management: Walpen AG

Requirements:

  • Complex building
  • Steep terrain
  • Continuous dewatering
  • Exposed concrete surface type 4.1
  • Rock stabilization
  • Limited crane application area
  • High work safety requirements
  • Form slab over 6.50 m height