- Client: EnBAG AG
- Site management / Reference person: Teysseire & Candolfi AG / Abgottspon Pascal
- Foreman: D'Onofrio Pierluigi / Theler Beda
- Foreman: Schnydrig Mario
- Construction time: October 2016 to November 2018
- Construction costs: CHF 1.0 million
Technical data:
- 450 m3 concrete
- 50 tons of reinforcement
- 950 m3 Excavation
- 8 micropiles
- 1'350 m2 wall formwork
- 200 m2 slab formwork
Project description:
Above Visperterminen, in Muttji, a surge chamber was newly constructed together with two distribution shafts for the delivery of the corresponding water. The construction work was carried out by the consortium Walpen AG (50%) and Schmid Bautech AG (50%).
- Lead management: Walpen AG
- Technical management: Schmid Bautech AG
- Commercial management: Walpen AG
Requirements:
- Complex building
- Steep terrain
- Continuous dewatering
- Exposed concrete surface type 4.1
- Rock stabilization
- Limited crane application area
- High work safety requirements
- Form slab over 6.50 m height