- Client: HES-SO Valais-Wallis, Sion
- Construction Manager / Reference Person: NUNATAK Architextes Sàrl, Fully/Roland Vassaux
- Construction Foreman / Foreman: David Guillen/Garnier Benoît
- Construction time: 2016
- Construction costs: CHF 20.2 Mio
Technical specifications:
- 30'000m2 floor slab
- 32'000m2 wall formwork
- 16'000m2 slab formwork
- 32'000m2 Exposed formwork type 4.1
- 25'628m3 structural concrete
- 3'900to reinforcement
- 40'000m distance cages
- 761pcs prefabricated columns
- 3'070to pavement
Objektbeschrieb:
The construction work was carried out by the consortium Walpen AG / Frutiger AG Thun / Frutiger SA Savigny and André Sierro SA.
-
Lead management: Walpen AG, Stefan Volken Deputy Erhard Burgener
-
Tech. Management: Frutiger AG, Vaud
-
Commercial management: Walpen AG, Tamara Studer
The project Campus Energypolis HES-SO Sion involves the creation of a joint campus for the EPFL Chairs, the HES-SO Valais-Wallis School of Engineering and The Ark Foundation in Sion. Multi-storey parking garage with 3 buildings.
Special requirements:
- short construction time
- complex project