- Client: Lonza AG / Karl Zickler
- Construction management/contact person: Alpec Engineering / Sarah Herzig
- Site manager: Iwan Rieder
- Foreman: Manuel Ryter
- Construction period: October 2023 - July 2024
- Construction costs: 900,000
Technical data:
- 1 utility line construction cable shaft
- 95 m retention channels, in-situ concrete
- 680 m² paving work
- 450 m² excavation work
- 390 m³ in-situ concrete (floor slab, parapets)
- 60 tons reinforcement
- 165 m joint sealing (Fugenstern system)
Project description:
This project involved the construction of floor slabs for a new container facility (Key Plants) for the pharmaceutical industry on the Lonza AG site in Visp.
In addition to the floor slabs, a cable duct and drainage for the surrounding area were also installed.
Requirements:
The work was carried out in the central Lonza/BEX area. The adjacent roads had to remain open to traffic at all times during the construction work. The construction site had to be set up accordingly and the work coordinated with the company.
Furthermore, all construction work was carried out in compliance with Lonza's strict safety regulations (EHS manual).