- Client: Valimag Immobilien AG par UBS Fund Management
- Construction management / Reference person: HRS Real Estate SA / Vidal José
- Foreman: Burgener Erhard / Antonio D'Onofrio
- Foreman: Steiner Erich
- Construction period: February 2015 to December 2015
- Construction costs: CHF 7.2 million
Technical data:
- 3'600m3 lean concrete
- 9'200m3 concrete
- 800 tons of reinforcement
- 22'555m2
- Wall formwork 5'300m2
- Exposed formwork type 4.1 wall
- 19'400m2 Slab formwork
- 8'100m2 Exposed formwork type 4.1 slab
- 637 Prefabricated columns
Project description:
Three buildings (L, M and P) with six upper floors and two underground garages were built at the La Matze construction site in Sion. The buildings house various stores and apartments in the city center of Sion.
Requirements:
- tight space conditions
- Very short construction time
- Exposed concrete type 4.1