Sion

New building La Matze

  • Client: Valimag Immobilien AG par UBS Fund Management
  • Construction management / Reference person: HRS Real Estate SA / Vidal José
  • Foreman: Burgener Erhard / Antonio D'Onofrio
  • Foreman: Steiner Erich
  • Construction period: February 2015 to December 2015
  • Construction costs: CHF 7.2 million

Technical data:

  • 3'600m3 lean concrete
  • 9'200m3 concrete
  • 800 tons of reinforcement
  • 22'555m2
  • Wall formwork 5'300m2
  • Exposed formwork type 4.1 wall
  • 19'400m2 Slab formwork
  • 8'100m2 Exposed formwork type 4.1 slab
  • 637 Prefabricated columns

Project description:

Three buildings (L, M and P) with six upper floors and two underground garages were built at the La Matze construction site in Sion. The buildings house various stores and apartments in the city center of Sion.

Requirements:

  • tight space conditions
  • Very short construction time
  • Exposed concrete type 4.1

Contact Persons

Erhard Burgener

Head of Civil Engineering
Member of the Executive Board

+41 79 744 68 16

+41 27 948 05 48

erhard.burgener@volken-group.ch

Erich Steiner

Federal dipl. foreman

+41 79 664 30 57

erich.steiner@volken-group.ch