- Client: Drivisp Sàrl
- Site management / Reference person: Thierry Rudaz / Rudaz architectes
- Site manager: D'Onofrio Pierluigi
- Foreman: Paulo De Almeida
- Construction time: April 2020 to December 2020
- Construction costs: 400'000 CHF
Technical data:
- 800m3 excavated material
- 200m2 wall formwork
- 100m2 slab formwork
- 7 tons of reinforcement
- 100m3 concrete
- 400 tons asphalt
Project description:
A new Burger King has been built at the entrance to Visp. The construction consists of a solid concrete and steel structure.
Requirements:
- Short construction time
- Start of pandemic measures