- Client: HES-SO Valais-Wallis, Sion
- Site management/reference person: NUNATAK Architextes Sàrl, Fully/Roland Vassaux
- Foreman/Polisher: David Guillen/Garnier Benoît
- Construction time: 2016
- Construction costs:CHF 20.2 million
Technical data:
- 30'000m2 floor slab
- 32'000m2 wall formwork
- 16'000m2 slab formwork
- 32'000m2 Exposed formwork type 4.1
- 25'628m3 Structural concrete
- 3'900to reinforcement
- 40'000m spacer cages
- 761pcs Prefabricated columns
- 3,070 tons of decking
Project description:
The construction work was carried out by the consortium Walpen AG / Frutiger AG Thun / Frutiger SA Savigny and André Sierro SA.
-
Lead management: Walpen AG, Stefan Volken Deputy Erhard Burgener
-
Tech. Management: Frutiger AG, Vaud
-
Commercial management: Walpen AG, Tamara Studer
The Campus Energypolis HES-SO Sion project involves the creation of a joint campus for the chairs of the EPFL, the School of Engineering of the HES-SO Valais-Wallis and The Ark Foundation in Sion. Multi-storey parking garage with 3 buildings.
Requirements:
- short construction time
- Complex project