- Client: H+W Konzept AG
- Site management / Reference person: MLS Arch. Zermatt / Medard Lehner
- Site manager: D`Onofrio Antonio
- Foreman: Dias Carlos
- Construction time: March 2019 to March 2020
- Construction costs: 3.0 million
Technical data:
- 3500 m3 excavation
- 90 pcs. Cast piles
- 2500 m3 concrete
- 370 tons of reinforcement
- 350 m2 KS masonry
- 2200 m2 brick masonry
- 2750 m2 wall formwork
- 5000 m2 slab formwork
- 500 m2 multilayer slab made of rock wool
Project description:
New construction of an apartment building (residential and commercial space) with a shared parking garage in Visp. The walls and ceilings of the parking garage are made of in-situ concrete and are located in the groundwater area. The surrounding walls of the buildings are made of concrete and partly of brick.
Requirements:
- Building in groundwater
- Groundwater lowering
- White tank
- Very short construction time
- Large spans (industrial construction)
- Ceiling height up to 5 meters
- Poured piles
- Open dewatering