Termen

New construction of sports field artificial turf

  • Client: FC Termen / Ried-Brig
  • Construction Manager / Reference Person: SPI Schmidhalter Partner Ingenieure / Iwan Rieder
  • Construction Foreman: D'Onofrio Pierluigi
  • Foreman: Cathrein Diego
  • Construction time: Mai 2019 bis August 2019
  • Construction costs: CHF 500'000

 

Technical specifications:

  • 4'500 m3 excavation / removal
  • 250 m3 Excavation trenches
  • 1'700 m3 Crushed stone 16/45
  • 250 m3 St.Jakob mixture 0/22
  • 4'500 m2 bentonite mat
  • 260 m edge terminations
  • 260 m cable protection pipes
  • 650 m drainage pipes
  • 80 t asphalt
  • 85 m3 structural concrete
  • 8 to reinforcement

 

Object description:

The location of the football pitch is defined by the width of the pitch with safety distance and the existing space between the road and the already existing sports field. Retaining walls in local concrete were built to compensate for the differences in height. The entire football pitch is irrigated with a sprinkler system and drained with drainage pipes. Underneath the artificial turf and the elastic layer, a St. Jacob's layer was laid according to the recipe using an asphalt paver with a tolerance of + - 10mm.

Special requirements:

  • Planarity precision

Contact persons

Pierluigi D'Onofrio

Department Manager Pollutant Remediation
Technician HF / Construction manager SBA

+41 79 368 63 62

+41 27 948 05 48

pierluigi.donofrio@volken-group.ch