Salgesch

New construction of WÜB Les Lys

  • Client: Michel Florey Renotec
  • Construction Manager / Reference Person: Immob 2000, Sierre, Michael Ribeiro
  • Construction Foreman: D'Onofrio Antonio
  • Foreman: Wyssen Gabriel
  • Construction time: April 2017 to May 2018
  • Construction costs: CHF 2.7 million

 

Technical specifications:

  • 200to reinforcement
  • 8'600m² wall formwork
  • 4'300m² slab formwork
  • 100m² cement block masonry
  • 2'400m³ concrete
  • 6'000m³ excavation
  • 6 pcs of columns

 

Object description:

In Salgesch a WÜB consisting of 3 apartment buildings (25 residential units) was built. In the basement all 3 buildings have a large parking garage with a total of 33 parking spaces. The perimeter walls and the ceilings of the parking garage are made of in-situ concrete. The perimeter walls of the building are made of concrete including all ceilings.

 

Special requirements:

  • Terrace ceilings and walls in exposed concrete