- Client: Michel Florey Renotec
- Construction Manager / Reference Person: Immob 2000, Sierre, Michael Ribeiro
- Construction Foreman: D'Onofrio Antonio
- Foreman: Wyssen Gabriel
- Construction time: April 2017 to May 2018
- Construction costs: CHF 2.7 million
Technical specifications:
- 200to reinforcement
- 8'600m² wall formwork
- 4'300m² slab formwork
- 100m² cement block masonry
- 2'400m³ concrete
- 6'000m³ excavation
- 6 pcs of columns
Object description:
In Salgesch a WÜB consisting of 3 apartment buildings (25 residential units) was built. In the basement all 3 buildings have a large parking garage with a total of 33 parking spaces. The perimeter walls and the ceilings of the parking garage are made of in-situ concrete. The perimeter walls of the building are made of concrete including all ceilings.
Special requirements:
- Terrace ceilings and walls in exposed concrete