- Client: Aletsch Bahnen AG
- Construction Manager / Reference Person: Iwan Rieder SPI / Anton Franzen Aletsch Bahnen
- Construction Foreman: Adem Salihi
- Foreman: Marco Gruber
- Construction time: April 2019 bis November 2019
- Construction costs: CHF 3.14 Mio.
Technical specifications:
- 3`100 m3 Earthworks - Excavation
- 3`845 m2 formwork
- 200t. Reinforcement
- 1`250 m3 of concrete
- 135t. pavement construction
- 210 m2 Sytec TerraStone
- 100 m3 Block stone wall
Object description:
The Aletsch Bahnen AG intend to build a new feeder lift from Fiesch to Fiescheralp (Kühboden) for the winter season 2019 / 2020. The larger of the two existing reversible aerial tramways with 100-seater cabins is to be replaced. A later dismantling of the smaller reversible aerial tramway with the 34-passenger cabins will take place in 2020. With the construction of a circulating aerial tramway from the new public transport hub in Fiesch, the transport capacity to Kühboden can be increased and a continuous flow of passengers and goods can be guaranteed. 13 masts with a height of 10-20 metres are necessary for the routing of the new 10-cabin circulating railway from Fiesch to Kühboden.
Special requirements:
- Mountain construction site
- Short construction time
- Weather dependent