Fiesch

Public Transport Hub Module 4: Mountain Station & Supports

  • Client: Aletsch Bahnen AG
  • Construction Manager / Reference Person: Iwan Rieder SPI / Anton Franzen Aletsch Bahnen
  • Construction Foreman: Adem Salihi
  • Foreman: Marco Gruber
  • Construction time: April 2019 bis November 2019
  • Construction costs: CHF 3.14 Mio.

 

Technical specifications:

  • 3`100 m3 Earthworks - Excavation
  • 3`845 m2 formwork
  • 200t. Reinforcement
  • 1`250 m3 of concrete
  • 135t. pavement construction
  • 210 m2 Sytec TerraStone
  • 100 m3 Block stone wall

 

Object description:

The Aletsch Bahnen AG intend to build a new feeder lift from Fiesch to Fiescheralp (Kühboden) for the winter season 2019 / 2020. The larger of the two existing reversible aerial tramways with 100-seater cabins is to be replaced. A later dismantling of the smaller reversible aerial tramway with the 34-passenger cabins will take place in 2020. With the construction of a circulating aerial tramway from the new public transport hub in Fiesch, the transport capacity to Kühboden can be increased and a continuous flow of passengers and goods can be guaranteed. 13 masts with a height of 10-20 metres are necessary for the routing of the new 10-cabin circulating railway from Fiesch to Kühboden.

 

Special requirements:

  • Mountain construction site
  • Short construction time
  • Weather dependent

Contact persons

Adem Salihi

Department Manager Foundation Engineering

+41 79 755 23 92

+41 27 948 05 48