- Client: Municipality of Naters
- Construction Manager / Reference Person: Ingenes AG
- Construction Foreman: Nicolas Zenklusen
- Construction Foreman STV: Erhard Burgener
- Foreman: Orlando Truffer
- Construction time: October 2018 - October 2020
- Construction costs: 2.5 Mio
Technical specifications:
- 4'200 m³ excavation
- 4'250 m³ coffer material
- 1'600 m² natural stone paving
- 1'450 m' curbstones / paving slabs
- 1'750 to of pavement
Object description:
The road body incl. the service lines of the Bealp- and Bahnhofstrasse Naters has been rehabilitated in 8 stages. As a design element, various natural stone pavements have been integrated into the overall concept.
Special requirements:
- Work under running traffic