- Client: Municipality of Leuk
- Construction Manager / Reference Person: Girola & Trautmann / Jean Gérard Giorla
- Construction Foreman: Pierluigi D`Onofrio
- Foreman: Paulo José De Almeida Oliveira
- Construction time: November 2021 - August 2023
- Construction costs: 1.3 million
Technical specifications:
- Moving of several prefabricated concrete elements
- 1'300m³ UG 0/45
- 560to asphalt
- 400m³ excavation
- 600m² humus laying
- 2500m² lawn
- 450m terminations flat steel V2A
- 50m finishings granite
Object description:
The existing primary school building in Susten was extensively renovated. The entire surrounding area was redesigned.
Special requirements:
- Heavy school traffic in the construction area
- Tight space conditions
- Short construction time