Replacement new building cheese dairy

  • Client: Alpine dairy cooperative Grengiols 
  • Construction Manager / Reference Person: Ernst Zumthurm
  • Construction Foreman: Peter Hutkai
  • Construction Foreman STV: Erhard Burgener
  • Foreman: Anton Pfaffen
  • Construction time: October 2020 - April 2021
  • Construction costs: CHF 490,000

Technical specifications:

  • 500 m³ excavation pit 
  • 460 m² formwork
  • 260 m³ in-situ concrete
  • 30 to reinforcement
  • 400 m² masonry

Object description:

The old cheese dairy has been replaced by a new building. The dairy is founded on a floor slab in in-situ concrete. The bearing walls are made of in-situ concrete and timber framing, while the infill walls are made of sand-lime bricks.  

Special requirements:

  • Base slab in mono concrete