Visp

Repurposing A07 East Goods Receiving

  • Client: LONZA AG
  • Construction management / Contact person: Lonza AG – Roger Nyffenegger / Architekturdienste GK Gmbh – German Kurz / Bauingenieure F.Williner AG – Markus Arnold
  • Construction manager: Jasin Ajeti
  • Foreman: Michele Fuse
  • Construction period: November 2021 – February 2022
  • Construction costs: $630,000.-

Technical data: 

  • 430 m² demolition of flooring
  • 180 m³ type A soil removal 
  • 560 m³ soil removal type B
  • 385 m³ soil removal type E
  • 580 m³ trench excavation for utility lines
  • 285 m cable protection pipes
  • 4 cable shafts
  • 120 m sewerage & drainage
  • 5 inspection chambers
  • 4 pump chambers
  • 730 m³ foundation layers UG 0/45
  • 2,000 m² cement stabilization of foundation layers
  • 100 m edge closures
  • 430 tons of paving work
  • 60 m³ concrete work

Property description:

The new technical goods receiving area is being built in the existing A07-East hall, which dates from the 1990s. The wasteland in front of it will be converted into a vehicle yard and connected to the internal road network with two new level crossings. The exterior appearance of the hall will remain unchanged. Windows, doors, and three goods receiving ramps for delivery trucks and lorries will be installed in the existing facades. The interior of Hall A07-East will be equipped with logistics facilities for goods receiving and a two-story extension consisting of offices, break rooms, cloakrooms, toilets, and technical rooms.

Requirements

  • Material management
  • Logistics
  • Short construction time

Special features

  • Material management and various load classes