- Client: Volken Immobilien AG
- Construction Manager / Reference Person: Kurt Werlen Albrechtarchitekten
- Construction Foreman: D’Onofrio Pierluigi
- Foreman: Carlos Dias
- Construction time: September 2019 until July 2021
- Construction costs: 3 Mio.
Technical specifications:
- 10'000m3 excavated material
- 8'500m2 wall formwork
- 7'500m2 slab formwork
- 350to reinforcement
- 3'700m3 concrete
- 5'500m2 Brickwork
Object description:
3 apartment buildings with 2.5, 3.5, 5.5 and two 5.5 attic room flats. The apartment buildings are centrally located. Various shopping facilities, post office, sports field and the railway station are within walking distance.
Special requirements:
- Short construction time
- Work in the area of traction current installations
- Start of measures Pandemic