Herbriggen

Road renovation cantonal road Herbriggen

  • Client: Canton of Valais, District 1 - Upper Valais, Mobility Department
  • Site manager/reference person: Severin Bieri / Canton Walli
  • Site manager: Celine Ludi
  • Foreman: Diego Barberi
  • Construction period: August 2023 to July 2024
  • Construction costs: 2.40 million

Technical data:

  • New retaining wall: 140m
  • Pavement demolition 2400 tons
  • Excavation/removal 4300 m3
  • UnGe 0/45 3800 m3
  • Edge finishes 1300 m
  • Grading 5500 m2
  • Pipes 600 m1
  • Inlet and inspection chambers 22 pcs
  • Surfacing 2250 tons

Project description:

The road is now being renovated to generally improve road safety and maintain its value. In addition to replacing the road foundation and the edge seals, the entire pavement structure is being rebuilt. The road drainage will be optimized and renovated. The road section to be renovated extends over a length of 630 meters between the two entrances to the village of Herbriggen.

Requirements:

  • Close to the MGB track Safety chief required
  • Work in traffic light operation Road can be driven on one side