- Client: EnBAG AG
- Construction Manager / Reference Person: Teysseire & Candolfi AG / Abgottspon Pascal
- Construction Foreman: D'Onofrio Pierluigi / Theler Beda
- Foreman: Schnydrig Mario
- Construction time: October 2016 until November 2018
- Construction costs: CHF 1.0 Mio
Technical specifications:
- 450 m3 concrete
- 50 to reinforcement
- 950 m3 excavation
- 8 pcs micropiles
- 1'350 m2 wall formwork
- 200 m2 slab formwork
Object description:
Above Visperterminen, in the Muttji, a surge chamber was newly constructed together with two distribution shafts for the delivery of the corresponding water. The construction work was carried out by the consortium Walpen AG (50%) and Schmid Bautech AG (50%).
- Lead management: Walpen AG
- Technical management: Schmid Bautech AG
- Commercial management Walpen AG
Special requirements:
- Complex building
- Steep terrain
- Continuous dewatering
- Exposed concrete surface type 4.1
- Rock support
- Limited crane application area
- High demands on work safety
- Form slab over 6.50 m height