Visperterminen

Water distribution chamber Muttji

  • Client: EnBAG AG
  • Construction Manager / Reference Person: Teysseire & Candolfi AG / Abgottspon Pascal
  • Construction Foreman: D'Onofrio Pierluigi / Theler Beda
  • Foreman: Schnydrig Mario
  • Construction time: October 2016 until November 2018
  • Construction costs: CHF 1.0 Mio

 

Technical specifications:

  • 450 m3 concrete
  • 50 to reinforcement
  • 950 m3 excavation
  • 8 pcs micropiles
  • 1'350 m2 wall formwork
  • 200 m2 slab formwork

 

Object description:

Above Visperterminen, in the Muttji, a surge chamber was newly constructed together with two distribution shafts for the delivery of the corresponding water. The construction work was carried out by the consortium Walpen AG (50%) and Schmid Bautech AG (50%).

  • Lead management: Walpen AG
  • Technical management: Schmid Bautech AG
  • Commercial management Walpen AG

 

Special requirements:

  • Complex building
  • Steep terrain
  • Continuous dewatering
  • Exposed concrete surface type 4.1
  • Rock support
  • Limited crane application area
  • High demands on work safety
  • Form slab over 6.50 m height

Contact person

Pierluigi D'Onofrio

Department Manager Pollutant Remediation
Technician HF / Construction manager SBA

+41 79 368 63 62

+41 27 948 05 48

pierluigi.donofrio@volken-group.ch