We have well-established safety measures in place to protect our employees and the environment.
Parallel to the excavation, the slope stabilization work is being carried out by our special civil engineering division (Valjetting AG) on the MFH Brigerbärg. This will ensure safety at all times during the entire construction work in the excavation pit. In addition, the building will later be protected from mountain and slope pressure.