- Client: Aletsch Bahnen AG
- Site management/reference person: Anton Franzen, Steve Krüger, Yannick Minnig
- Site manager: Jasin Ajeti
- Foreman: Goran Aleksic
- Construction period: June 2022 - October 2022
- Construction costs: 420,000
Technical data:
- Approx. 2.6 km of trench excavation in soft ground and rock
- Approx. 4.0 km of cast iron pipes
- Approx. 8.0 km of cable protection pipes
- 32 concrete shafts
Project description:
The Volken Group is expanding the snowmaking system on the Riederalp to ensure snow reliability. A 2.6 km long trench is being excavated and equipped with 32 concrete shafts. Once the trench has been filled, the base for the slopes will be created.
Requirements:
- Mountain construction site
- Short construction time
- Logistics and transportation
Special features:
- Material preparation for pipe coating with screening bucket on site