Bitsch

HWS KW Electro Massa

  • Client: HYDRO Exploitation SA
  • Construction Manager / Reference Person: SRP Ingenieure, Léonard Murisier
  • Construction Foreman: Pierluigi D`Onofrio 
  • Foreman: Florian Grand
  • Construction time: April 2019 - May 2019
  • Construction costs: CHF 200,000

Technical specifications:

  • 400m³ excavation
  • 100m³ UG 0/45
  • 185m² asphalt demolition
  • 58 tons of asphalt paving
  • 170m PP pipes DN/OD 160
  • 350m² formwork
  • 8 tons reinforcement
  • 56m³ concrete NPK G

Object description:

A new wall is being built as flood protection for the flushing. The existing flood embankment is removed and the material is installed together with the surplus material between the switchgear and the canal. During the excavation work, the cables with voltages of up to 16 kV remain in operation.

Special requirements:

  • Work in the vicinity of the electrical plant
  • Protective measures in the water area
  • Short construction time
  • Special measures against dust formation
  • Carefully break off cable duct in operation

Contact person

Florian Grand

Machinist

Pierluigi D'Onofrio

Department Manager Pollutant Remediation
Technician HF / Construction manager SBA

+41 79 368 63 62

+41 27 948 05 48

pierluigi.donofrio@volken-group.ch