Visp

Nelkenweg II residential development

  • Client: Baugemeinschaft Nelkenweg
  • Site management / reference person: bpm Schmidt / Peter Schmidt
  • Site manager: Mathias Wyssen
  • Foreman: Erich Steiner
  • Construction time: October 2020 - July 2021
  • Construction costs shell: 2.3mio.

Technical data:

  • 5'500m3 excavation
  • 300 tons of reinforcement
  • 2300m3 of structural concrete
  • 10'000m2 formwork
  • 1250m2 masonry

Project description:

The second stage of the Nelkenweg residential development is being built in Visp West with the "Neubau Nelkenweg 2". With the second stage, 16 residential units will be realized. Construction began in October 2020 and the building should be ready for occupancy in summer 2022.