- Client: Canton of Valais
- Site management / reference person: OBL - Canton of Valais - Eusebius Gasser / öBL - Teysseire & Candolfi AG - Oliver Jäger
- Foreman: Jasin Ajeti
- Foreman: Daniel Maric
- Construction period: March - May 2024
- Construction costs: 220'000.-
Technical data:
- 50 m³ excavation / removal
- 20 m³ in-situ concrete
- 100 m³ foundation layers RC gravel mix B 0/45
- 250 m' edge finishes
- 150 tons. Surfacing
- 3 pcs. Prefabricated concrete benches
Object description:
The bus stop (Turtmann railroad station junction) must be brought into line with the Disability Discrimination Act (BehiG) to ensure accessibility in public areas. This includes adapting the edges and widths of the footpaths (locally). The conversion includes the creation of an installation site, excavation and earthworks, slope stabilization, foundation layer work, special barriers for people with disabilities, bituminous surfacing and concrete benches. Existing kerbs including concrete and road surfaces will be demolished and transported to landfill. The construction work will be carried out in stages so as not to obstruct public road traffic
Requirements for
- Material management
- Work under traffic
- Short construction time
Special features:
- Material management: excavation, backfill and topsoil were largely reused on the construction site.