- Client: Volken Manfred
- Site management / reference person: Peter Schmidt / bpm Schmid
- Foreman: D'Onofrio Pierluigi
- Foreman: Pfammatter Elmar
- Construction period: July 2018 to August 2019
Technical data:
- 1'000 m3 excavated material
- 1'000 m2 wall formwork
- 500m2 slab formwork
- 30 tons of reinforcement
- 300 m3 concrete
- 250m2 Brickwork
- 100m2 Quarry stone masonry
Project description:
An EFH in solid construction was built in Bitsch. An elaborate environment was created with quarry stone masonry.
Requirements:
- Archaeological inspection
- Short construction time