Visp

New construction of WÜB Binapark II

  • Client: Volken Immobilien AG
  • Site management/reference person: bpm Schmidt / Peter Schmidt
  • Foreman/Polisher: D'Onofrio Antonio / Catherin Diego
  • Construction time: April 2016 to April 2017
  • Construction costs: CHF 3.5 million

Technical data:

  • 400 tons of reinforcement
  • 6'000m2 wall formwork
  • 6'000m2 slab formwork
  • 2'500m2 brick masonry
  • 120m2 cement block masonry
  • 3'300m3 concrete
  • 1'000m2 Layered text
  • 300m2 Exposed formwork type 4.
  • 600m2 Exposed formwork type 2.1
  • 6'000m3 excavation

Project description:

Close to the swimming pool and sports field, on Lavendelweg in Visp, the Binapark II residential development is being built in a 2nd stage. The development consists of 3 apartment buildings (21 residential units). In the basement, all 3 buildings are connected by a large parking garage (33 parking spaces).

Requirements:

  • Parking garage in groundwater (white tank waterproofing)
  • Walls, ceilings and floor slab in in-situ concrete
  • Groundwater lowering
  • Balcony ceilings and walls all in exposed concrete