Salgesch

New construction WÜB Les Lys

  • Client: Michel Florey Renotec
  • Site management / Reference person: Immob 2000, Sierre, Michael Ribeiro
  • Site manager / foreman: D'Onofrio Antonio / Wyssen Gabriel
  • Construction time: April 2017 to May 2018
  • Construction costs: CHF 2.7 million

Technical data:

  • 200 tons of reinforcement
  • 8'600m² wall formwork
  • 4'300m² slab formwork
  • 100m² cement block masonry
  • 2'400m³ concrete
  • 6'000m³ excavation
  • 6 columns

Project description:

In Salgesch, a residential complex consisting of 3 apartment buildings (25 residential units) was built. In the basement, all 3 buildings have a large parking garage with a total of 33 parking spaces. The surrounding walls and the ceilings of the parking garage are made of in-situ concrete. The surrounding walls of the building are made of concrete, including all ceilings.

Requirements:

  • Terrace ceilings and walls in exposed concrete