- Client: Canton of Valais
- Site manager/reference person: Reto Gasser
- Site manager: Antonio D`Onofrio
- Foreman: Diego Barberi
- Construction period: Nov./2021-Nov./2022
- Construction costs: 2 million
Technical data:
- 3000 m3 excavation
- 500 m3 Demolished pavement
- 1700 m3 unbound mixtures
- 850 to. asphalt
- 200 m2 formwork type 4.1
- 45 tons of reinforcement
- 400 m3 concrete
Project description:
At the H19 Brig - Furkapass section Mörel - Filet construction site, the infrastructure lines and the sidewalk were newly constructed. The entire road structure was renewed from the ground up.
Requirements:
- Work under traffic (traffic lights)
- Difficulties due to railroad crossing (work safety)
- Short construction time