Mörel fillet

New sidewalk - cantonal road

  • Client: Canton of Valais
  • Site manager/reference person: Reto Gasser
  • Site manager: Antonio D`Onofrio
  • Foreman: Diego Barberi
  • Construction period: Nov./2021-Nov./2022
  • Construction costs: 2 million

Technical data:

  • 3000 m3 excavation
  • 500 m3 Demolished pavement
  • 1700 m3 unbound mixtures
  • 850 to. asphalt
  • 200 m2 formwork type 4.1
  • 45 tons of reinforcement
  • 400 m3 concrete

Project description:

At the H19 Brig - Furkapass section Mörel - Filet construction site, the infrastructure lines and the sidewalk were newly constructed. The entire road structure was renewed from the ground up.

Requirements:

  • Work under traffic (traffic lights)
  • Difficulties due to railroad crossing (work safety)
  • Short construction time