Susten

New Susten school building

  • Client: Municipality of Leuk
  • Site management / Reference person: ARGE Giorla & Trautmann / Jean Gérard Giorla
  • Foreman: D`Onofrio Antonio
  • Foreman: Cathrein Diego
  • Construction time: August 2019 - November 21
  • Construction costs: 1.9 million

Technical data:

  • 200 tons of reinforcement
  • 1000 m2 wall formwork type 2
  • 2500 m2 Wall exposed formwork type 4.1.4
  • 100 m2 Facade single-sided exposed formwork 4.1.4
  • 2200 m2 Slab formwork type 2
  • 360 m2 Slab exposed formwork type 4.1.4
  • 200 m2 Brick masonry
  • 1800 m3 concrete

Project description:

The primary school building in Susten is used by the daycare center, kindergarten and primary school pupils. The interior walls, ceilings, staircase and all galleries were made of exposed concrete.

Requirements:

  • Basement in groundwater (white tank waterproofing)
  • Walls, ceiling and floor slab in in-situ concrete
  • Walls and ceilings in the classroom included. Staircase in exposed concrete
  • Galleries and openings up to 6 meters high.
  • Exterior façade two shell masonry concrete walls. Exposed concrete on both sides.
  • Complex building
  • Corona pandemic measures

Further links:

Swiss-Architects

Susten parish - Opening of the school building

Contact Persons