Gampel – Steg

Scuff protection Schlüüchu

  • Client: Municipality of Gampel – Bratsch
  • Construction management / contact person: INGENES AG – Nikola Vasilic
  • Site manager: Jasin Ajeti
  • Foreman: Orlando Truffer
  • Construction period: January to March 2024
  • Construction costs: $400,000

Technical data: 

  • 55 m³ concrete demolition
  • 3,260 m³ excavation
  • 2,600 m³ backfilling
  • 650 m³ removal
  • 900 tons delivery of stones
  • 200 m² formwork
  • 280 m² counterformwork
  • 44,000 kg reinforcement
  • 620 m³ concrete
  • 2,500 tons block carpet embedded in concrete

Project description:

The construction work includes the creation of scour protection in front of the Schlüüchu barrier. A safety concept was drawn up for the work in the channel, which included a safety plan for natural hazards during the construction phase and had to be strictly adhered to.

The following work was carried out:

  • Construction installations
  • Construction site access
  • Maintenance and operation of water drainage
  • Excavation work
  • Concrete work, including all necessary winter protection measures
  • Creation of concrete-encased block foundations
  • Backfilling and embankments
  • Dismantling and disposal of temporary water drainage systems
  • Demolition of access ramp
  • Demolition and restoration of construction installation and landfill sites
  • Finishing work

Requirements

  • Material management
  • Work on open water bodies
  • Short construction period

 

Contact persons

Jasin Ajeti

HF technician / SBA construction foreman

+41 27 948 05 13

jasin.ajeti@volken-group.ch