- Client: ValaisHospital
- Site management / reference person: David Bittel ARGE Bauleitung albrecht+amoba Brig
- Site manager: D'Onofrio Pierluigi
- Foreman: Agron Selimi
- Construction period: November 2024 to December 2025
- Construction costs: CHF 1.60 million
Technical data:
- 22'000m² impact sound insulation
- 22'000m² thermal insulation
- 20'000m edge strips
- 3'000m² bonded screed
- 22'000m² floating screed
- 2'500m² cement screed, terrazzo look
- 2'500m² priming and sealing
Project description:
The new Valais hospital is being built in Brig. A total of 13 floors are being built.
Requirements:
- Short construction time
- High safety precautions
- The grinding processes were carried out with the utmost precision and know-how.
- The final impregnation and sealing of the final floor covering in several work steps produces the desired terrazzo floor.