Our teams consist of people from all over the world who work hand in hand with one another.
In collaboration with the construction company E. Lauber & Sohn Hoch- und Tiefbau AG, the Volken Group, together with the WALABA consortium, is carrying out the construction work for the new Walka school building in Zermatt. Demolition work on the Walka 1 and 2 school buildings has been underway since April. Currently, the gymnasium is being demolished. A 50-metric-ton excavator with a 23-meter-long boom is being used for this purpose. Piece by piece, the walls are being torn down with a demolition hammer. The demolition debris is sorted on-site using a second excavator equipped with various attachments, such as a sorting grapple or magnet. Construction debris, glass, wood, scrap metal, and insulation are then transported away separately by truck and, where possible, recycled at the company’s own recycling facilities.