Our teams consist of people from all over the world who work hand in hand with one another.
In parallel with the excavation work, our Special Civil Engineering division (Valjetting AG) is carrying out slope stabilization work at the Brigerbärg apartment building. This ensures safety at all times throughout the construction work in the excavation pit. In addition, the building will later be protected against pressure from the mountain and the slope.











