- Client: Oltra AG, Olten / Rolf Haueter
- Site management / Reference person: W. Thommen AG, Olten / Max Gloor
- Foreman / Foreman: D'Onofrio Antonio / D'Onofrio Francesco
- Construction time: June 2014 to August 2015
- Construction costs: CHF 3.4 million
Technical data:
- 6,200m3 concrete
- 600 tons of reinforcement
- 220m2 KS masonry
- 3'500m2 load-bearing brickwork
- 350m2 Bricks retrofitted
- 8'000m2 Wall formwork
- 7'200m2 slab formwork
- 2'100m2 Schichtex
Project description:
New construction of 3 apartment buildings (total of 45 residential units) and a shared parking garage in Visp. The walls and ceilings of the parking garage are made of in-situ concrete and are located in the groundwater area. The surrounding walls of the buildings themselves are made of concrete and partly of brick. All ceilings are made of in-situ concrete. The residential development is surrounded by a very large area.
Requirements:
- Building in groundwater
- Groundwater lowering
- White tank groundwater sealing
- Very short construction time
- Complex buildings
- Large surroundings with several squares and paths