Turtmann

WÜB Märtplatz

  • Client: Building consortium Volken Immobilien and Pierre-Alain Grichting
  • Site management / Reference person: Bieri Christian / Albrecht Architekten
  • Site manager: D'Onofrio Pierluigi
  • Foreman: Wyssen Sascha
  • Construction period: May 2018 to November 2019
  • Construction costs: 2.4 million

Technical data:

  • Excavated material 8'000 m3
  • Wall formwork 6'000 m2
  • Slab formwork 4'000m2
  • Reinforcement 240 tons
  • Concrete 2600 m3
  • Brickwork 1'800 m2

Project description:

Two apartment buildings with studio 1.5, 3.5, 4.5 and two 6.5 room duplex apartments. The apartment buildings are centrally located on Märtplatz. Various shopping facilities can be reached in a few minutes.

Requirements:

  • Short construction time
  • Demolition work with asbestos removal

Contact Persons