- Client: Building community Binapark
- Site management / reference person: Bpm Schmidt / Peter Schmidt
- Foreman: D`Onofrio Antonio
- Foreman: Cahtrein Diego
- Construction time: August 2012 - August 2013
- Construction costs: 3.0 million
Technical data:
- 400 tons of reinforcement
- 6,000 m2 wall formwork
- 6,000 m2 slab formwork
- 2'500 m2 brick masonry
- 120 m2 cement block masonry
- 3'300 m3 concrete
- 1'000 m2 multi-layer slab rock wool core
- 300 m2 Exposed formwork type 4.1
- 600 m2 Exposed formwork type 2.1
- 6'000 m3 excavation
Project description:
The Binapark A, B and C residential development is located on Sonnenstrasse in Visp, close to the swimming pool and sports field. The development consists of 3 apartment buildings (21 residential units). Each apartment building has its own parking garage with 11 parking spaces in the basement
Requirements:
- Parking garage in groundwater (white tank waterproofing)
- Walls, ceilings and floor slab in in-situ concrete
- Groundwater lowering
- Balcony ceilings and walls in exposed concrete
Further links: