Brig

Brig Hospital, gardening work - partial contract south

  • Client: Spitalzentrum Oberwallis
  • Site management/reference person: ARGE Bauleitung Albrecht & Amoba / Samuel Werlen
  • Project engineer: Extra Landscape Architects / David Gnehm
  • Site manager: Iwan Rieder
  • Foreman: Jean-Marc Gottsponer
  • Construction period: March 2024 - Dec 2025
  • Construction costs: CHF 350,000

Technical data:

  • 200m of raw angle steel ends
  • 4 staircases with metal ends
  • 160m chrome steel railings
  • 150m³ earthworks
  • 80m³ of cultivated soil
  • 1350m³ excavation pit
  • 120m utility line construction

Project description:

In connection with the new hospital building in Brig, the existing south entrance to the hospital had to be redesigned.

A wheelchair-accessible ramp and stairs for pedestrian access were built. Metal profiles were installed for the sides of the ramp and the stairs. The combination of raw metal profiles with the finished asphalt surface makes the access a visual highlight.

Lighting elements and a surface drainage system were also installed as part of the work.

Requirements:

  • Interfaces master builder work and assembly construction in steel with increased accuracy requirements.
  • Execution of stairs in combination with metal finishes and asphalt

 