Fieschertal

Civil engineering work for new reservoir construction

  • Client: Municipality of Fieschertal
  • Construction management / contact person: Rudaz+Partner AG / Benjamin Zaugg
  • Site manager: Jasin Ajeti
  • Foreman: Goran Aleksic
  • Construction period: May – October 2020
  • Construction costs: $274,000

Technical data: 

  • 1,200 m² soil removal
  • 1,300 m³ blasting excavation, excavation depth up to 12 m
  • 1,700 m³ backfill reservoir
  • 100 m sewerage/drainage system
  • 130 tons block rubble
  • 1,400 m² topsoil

Property description:

The new reservoir is planned with two basins so that maintenance and cleaning can be carried out during operation. The new building will house an operations center with the appropriate switch cabinets for monitoring and control technology. An internal coating is planned for the reservoir from the outset. The interior coating will be applied using the ETERTUB-aqua® system. This system has the advantage that leaks can be detected via a drainage system. By analyzing the drainage water, it can be determined whether the water comes from outside or inside the reservoir.

Requirements
  • Material management
  • Logistics & limited space
  • Short construction time

Special features

  • The excavation was 100% in solid rock.