- Client: Municipality of Visp
- Site management / reference person: Adt_Gmbh, Raron / Steiner Christian
- Foreman / Foreman: D'Onofrio Antonio / Salihi Faredin
- Construction time: September 2016 to November 2017
- Construction costs: CHF 0.56 million
Technical data:
- 223m2 formwork
- 8.5 tons of reinforcement
- 70m3 concrete
- 77m2 brickwork
- 600m2 Waterproofing
- 230m2 Trench injection
- 1'100 core drillings
- 100m2 concrete cuts 200 m2 flooring
- 110m2 Spray plaster and ceiling renovation
- 1'200 m3 excavation
Project description:
The "Sepp Blatter" school gym and games hall is being completely renovated and converted. The building is located in groundwater, which is why the entire exterior waterproofing is being replaced. In addition, all changing rooms, the weight room and the gymnastics area will be redesigned inside. An elevator will also be installed on the west side, in exposed concrete type 3.1.
Requirements:
- Short construction time
- Groundwater lowering