- Client: Municipality of Randa
- Site management/reference person: Daniel Bumann,IBR Ingenieurbüro GmbH
- Site manager: Celine Ludi
- Operator: Marullo Salvatore
- Construction time: May 2024
- Construction costs: 35'000.--
Technical data:
- 200m³ excavation
- 2 x strip foundations of 6m each
- 30 tons of natural stone set in concrete for bed reinforcement
- 55 tons of block set for inlet and outlet
Project description:
The existing culvert in the Brichbach in Randa was too small and had to be enlarged. A new, larger culvert with a box profile was constructed for this purpose.
Requirements:
- Working in the river
- Work during low water periods