Randa

Culvert in Flurstrasse Birchbach, Randa

  • Client: Municipality of Randa
  • Site management/reference person: Daniel Bumann,IBR Ingenieurbüro GmbH
  • Site manager: Celine Ludi
  • Operator: Marullo Salvatore
  • Construction time: May 2024
  • Construction costs: 35'000.--

Technical data:

  • 200m³ excavation
  • 2 x strip foundations of 6m each
  • 30 tons of natural stone set in concrete for bed reinforcement
  • 55 tons of block set for inlet and outlet

Project description:

The existing culvert in the Brichbach in Randa was too small and had to be enlarged. A new, larger culvert with a box profile was constructed for this purpose.

Requirements:

  • Working in the river
  • Work during low water periods