Fiesch

Public transport hub module 4: Mountain station & supports

  • Client: Aletsch Bahnen AG
  • Site management / reference person: Iwan Rieder SPI / Anton Franzen Aletsch Bahnen
  • Foreman: Adem Salihi
  • Foreman: Marco Gruber
  • Construction period: April 2019 to November 2019
  • Construction costs: CHF 3.14 million

Technical data:

  • 3,100 m3 earthworks - Excavation
  • 3'845 m2 formwork
  • 200 tons of reinforcement
  • 1'250 m3 Concrete
  • 135 tons of paving
  • 210 m2 Sytec TerraStone
  • 100 m3 Block wall

Project description:

Aletsch Bahnen AG intends to build a new feeder lift from Fiesch to Fiescheralp (Kühboden) for the 2019 / 2020 winter season. To this end, the larger of the two existing aerial tramways with the 100-passenger cabins is to be replaced. The smaller aerial tramway with the 34-passenger cabins will be dismantled at a later date in 2020. The construction of a circulating tramway from the new public transport hub in Fiesch will increase the transport capacity to Kühboden and ensure a continuous flow of passengers and goods. 13 masts with a height of 10-20 meters are required for the route of the new 10-passenger gondola lift from Fiesch to Kühboden.

Requirements:

  • Mountain construction site
  • Short construction time
  • Weather-dependent

Contact persons

Adem Salihi

Head of Special Civil Engineering Department

+41 27 948 05 08

adem.salihi@volken-group.ch

Marco Gruber

Foreman