- Client: Aletsch Bahnen AG
- Site management / reference person: Iwan Rieder SPI / Anton Franzen Aletsch Bahnen
- Foreman: Adem Salihi
- Foreman: Marco Gruber
- Construction period: April 2019 to November 2019
- Construction costs: CHF 3.14 million
Technical data:
- 3,100 m3 earthworks - Excavation
- 3'845 m2 formwork
- 200 tons of reinforcement
- 1'250 m3 Concrete
- 135 tons of paving
- 210 m2 Sytec TerraStone
- 100 m3 Block wall
Project description:
Aletsch Bahnen AG intends to build a new feeder lift from Fiesch to Fiescheralp (Kühboden) for the 2019 / 2020 winter season. To this end, the larger of the two existing aerial tramways with the 100-passenger cabins is to be replaced. The smaller aerial tramway with the 34-passenger cabins will be dismantled at a later date in 2020. The construction of a circulating tramway from the new public transport hub in Fiesch will increase the transport capacity to Kühboden and ensure a continuous flow of passengers and goods. 13 masts with a height of 10-20 meters are required for the route of the new 10-passenger gondola lift from Fiesch to Kühboden.
Requirements:
- Mountain construction site
- Short construction time
- Weather-dependent